Case Studies
Sample sustainability roadmaps we have designed, engineered and executed with our TEMS process.
We mine data collected through a series of increasingly detailed audits to produce clear, focused roadmaps to sustainability. Every roadmap includes design, financing, implementation, and ongoing monitoring.
Upgrades include a 2 MW dc solar system, with 4,586 450-Watt bifacial solar modules, resulting in 44,004 metric tons of atmospheric CO2 equivalent (MTCO2e) offset.
QuikTrip Distribution Center
Tolleson, AZ
Solar
LED
battery
backup
M&V
Metric tons Co2 reduction
44,004
Estimated lifetime savings of $445,642. Achieves net zero by offsetting 100% of electric bill. Includes 120.6 kW rooftop solar system.
Coca Cola Distribution Visitor Center
HOUSTON, TX
Solar
battery
backup
M&V
Estimated lifetime savings
$1.8 M
Metric tons Co2 reduction
19,181
2 MW fuel generator with custom sound-attenuated enclosure and 5,000 gallon underground fuel tank. Emergency backup power and load curtailment opportunities.
QuikTrip Distribution Center
BELTON, MO
battery
backup
M&V
Energy audit program to target low-cost, capital, and behavioral recommendations for energy use reduction resulting in 9.9% reduction in energy spending and $2.7M in savings
Ritz-Carton Energy Audit Program
MARRIOT INTERNATIONAL
reduction in energy spending
9.9 %
savings
$2.7M
Jessica brings 25+ years of purpose-driven engineering solutions with projects like these.
Jessica Lorentz
Energy Engineering Advisor
PE, CEM, BCxP, LEED AP
leadership case study
M&V
AUDIT
2MW solar microgrid producing 4,500 MWh annually.

Prominic
Rantoul, IL
4,500 MWh
Annual Production
Solar
battery
backup
M&V
micro-
grid
Multiple upgrades to several County facility buildings including courthouses, administrative buildings, public works, libraries
Municipal Facility Upgrades
LEON COUNTY, FL
in facility upgrades
$17M
Justin brings over 25 years of in the building performance and energy space, having managed numerous energy service projects with concentrations in Lighting, HVAC, DDC Automation, and Water/Wastewater.

Justin Forand
VP, Project Engineering
PE, CEM, LEED
leadership case study
water
IOT
LED
HVAC
2.08 MW dc / 1.74 MW dc Rooftop and Ground system

Rooftop and Ground Solar Generation System
wilson, NC
2.08/1.74 MWh
Rooftop and Ground System
Solar
M&V
HVAC
Design and construction of a 256 kW solar energy system with the US government, resulting in 2176475 kWh energy savings and reduction of 2176 metric tons CO2e.
US Marine Core Solar Facility

Metric tons Co2 reduction
2,176
Jeremie brings over 17 years of Solar Energy engineering and management experience with projects like these.
Jeremie Branton
Senior Project Manager
MBA, PMP
leadership case study
Solar
Municipal Water Meter replacement
for entire city from a drive-by system to a full cellular Advanced Metering Infrastructure (AMI) system
Municipal Facility Upgrades
oakland park, fl

estimated savings over 15 years
$15M
Justin brings over 25 years of in the building performance and energy space, having managed numerous energy service projects with concentrations in Lighting, HVAC, DDC Automation, and Water/Wastewater.

Justin Forand
VP, Project Engineering
PE, CEM, LEED
leadership case study
water
IOT
10.09 GWh solar system

King Solar Farm
SOUTH TEXAS
10.09 GWh
solar system
M&V
Solar
TRUSTED ADVISORS
We work with you to build customized energy solutions
that support your business and sustainability goals.
Made on
Tilda